Skip to content

Work

Live systems, automations, and site-type demos. A native app or a custom cabinet is scoped from your brief. Simple examples are open to click; owner cabinets stay behind login.

Live system

Pet Friends

A real product, not a brochure: an open community for guests, and a signed-in cabinet where owners add and look after their animals.

  • Public feed, pet gallery, and classifieds — look around with no login
  • Owner cabinet: add pets, photos, medical notes, and friends
  • Two worlds: owners manage the real animals; each pet can have a virtual life next to them
  • Virtual pet world: a digital personality, memories, and short hellos between animal friends — not a chatbot for humans
  • English and French

The owner cabinet is behind login. Guests can browse the feed, gallery, and classifieds without an account.

Open the public feed

Custom cabinet

Jobsite cabinet

A signed-in project manager for a medical contractor: jobsites, schedules, clients, and outreach — not a brochure site.

  • Dashboard with live project analytics
  • Projects, clients, team, and job lifecycle
  • Jobsite Gantt: tasks, milestones, and statuses
  • Outreach waves by email and SMS, with CSV in and campaign stats out

Private cabinet — no public login. Screens from a live system; client details are omitted here.

Automations

Two examples from a larger set that already runs. You see the result — a draft, a send, a report — not the wiring.

Automation

Lead outreach

Qualified contacts get a bilingual draft. You review. The next small batch is sent. Opt-out is a page on this site.

  • Drafts in English or French from what the public site actually shows
  • Approval before send — not a firehose
  • Small waves, then a pause for replies
  • Unsubscribe on this site, checked before every send

This run is ours. For a client it uses their list and their mailbox — not a public login.

Automation

Site and mailbox checks

A URL or a domain in, a readable report out: is the site reachable, is mail authenticated.

  • Website: DNS, HTTP and HTTPS, redirects, robots, sitemap, certificate dates
  • Mailbox: MX, SPF, DKIM, DMARC, BIMI
  • The same pass we run before talking about a site that is already live

Live flows. Same kind of check we can wire to your domain.

Reminders, CRM updates, and other live flows are not all listed here. These two show the kind of work.